Street Paving and Water Main Improvements

The Town of Munster maintains over 100 miles of water mains and over 200 lane-miles of paved streets. Pavement conditions are rated every other year using the Pavement Surface Evaluation and Rating (PASER) system. (PASER Dashboard). The Town maintains and updates a roadway Asset Management Plan annually.  We monitor the water main condition by maintaining an atlas of water main break locations.
Twice each year, the Town applies for funds from the State of Indiana through the Community Crossings Match Grant (CCMG) program to rehabilitate and reconstruct Town streets. Often, paving work is coordinated with water main replacement and/or traffic calming projects. Past projects are listed below. Blue lettering indicates a water main project. Orange lettering indicates traffic calming.

YEAR

LOCATION

MILES

2018
Azalea, Banbury, Cedarcrest, Cherrywood, Crimson Tree, Elmwood, Glastonbury, Ivy, Oriole, Redwood, Rose, Tamarack, Whitehall Garden
2.29
2019
Applewood, Kennedy, Margo, School, Tulip
1.11
2020
Harrison, Hohman, Margo
0.90
2020
Southwood, Camellia
0.57
2021
Bluebird, Crestwood, Elliott, Timrick
1.64
2022
River, N Delaware, E Delaware, Potomac
0.90
2023
White Oak, Cypress, Crestwood, Hawthorne
0.69
2023
White Oak, Camellia, Beverly
0.55
2024
Azalea, Thicket, Pasturegate, Tamarack, Treadway, Tudor, & Fran Lin-Oriole Crossing
1.32
2024
River, Kraay, Terrace, Forest
0.92
 
CONSTRUCTION UPDATES
  • News
  • More Info

News

Contact Us

1005 Ridge Road
Munster, IN 46321
Get Directions

  • Phone: 219-836-6900
  • Staff Directory

Stay Connected: