Northwest Munster Sidewalk Improvement Project

Northwest Munster Sidewalk Improvement Project
October 19 through November 20, 2026
Crews will replace about 1,000 feet of sidewalk in northwest Munster to meet ADA compliance standards and improve public safety. This page has everything you need to know while work is underway.
Please Note
This project is not part of the tornado repair effort. It is a separate, planned improvement funded through a Community Development Block Grant (CDBG), which the Town applied for before the storm.
When
Work begins Monday, October 19 and continues through Friday, November 20.
Where
Sidewalk replacement will take place on:
  • Sunnyside (both sides of the street)
  • Beverly Place
  • Beacon Place
The project area is in the northwest part of town, bounded by Interstate 80/94 to the north, Ridge Road to the south, Manor Avenue to the east, and Homan Avenue to the west. The sidewalks being replaced were selected in advance and cannot be changed under the terms of the grant agreement.
Sidewalk Replacement
What to Expect
  • No Parking: Signs will be posted in work areas from 6 AM to 6 PM. Please do not leave vehicles in posted areas, as they can slow down crews.
  • Sidewalk Closures: Sidewalks will be closed to pedestrians during construction. Please use another route and follow all posted signs and barriers.
  • Work Schedule: Crews will move street by street through the project area.
  • Driveways: If fresh concrete crosses your driveway, please keep vehicles and foot traffic off it until it has cured.
  • Restoration: Restoration will begin as soon as possible, and the contractor will take care of it.

CDBG Sidewalk Improvements: Work Schedule and Parking Information

As part of the Town’s Community Development Block Grant (CDBG) sidewalk improvement project, work will progress through the following areas:

  • Beverly Drive: Work will begin on the even-numbered side of the street. No-parking signs have been posted on both sides of Beverly Drive due to the street’s narrow width and the space needed for concrete trucks to safely access the work area. Vehicles must be removed from both sides of the street while work is underway.

  • Beacon Avenue: Work can take place on both sides of the street simultaneously. Parking restrictions are not anticipated to be an issue.

  • Sunnyside Avenue: Work will begin on the south side of the street.

  • Manor Avenue: Parking availability appears sufficient to accommodate the work.

Work schedules may vary as the project progresses. Residents are asked to follow posted parking signs and use caution when traveling through active construction areas. Thank you for your patience and cooperation as we make these improvements to our community.

Frequently Asked Questions
Is this project related to the tornado?
No. This project was planned and applied for before the storm. Storm damaged sidewalks are a separate matter and are being addressed through the FEMA reimbursement process.
Can I park in this area?
Please note any No Parking signs up in the area. Parking will be limited in current work areas, but you will be able to work on the street in areas not being worked on. 
What about the 50/50 Sidewalk Program?
Sidewalks scheduled for repair in 2026 were identified last year and will be completed by the end of the year. Sidewalks for 2027 have not yet been selected.
Can the sidewalks in this project be changed?
No. The locations were selected in advance and are fixed under the terms of the grant agreement.
Report a Sidewalk Concern
If you see a sidewalk that needs attention, including storm damage, please let us know. Email Public Works at publicworks@munster.org.
Thank You
Thank you for your patience as we make Munster’s sidewalks safer and more accessible for everyone.
  • Useful Links