Northcote Bridge Closure

The Town of Munster's flood mitigation closure of the Northcote Bridge is scheduled for September 3rd at 9:00 a.m.  We will be demonstrating our proposed closure technique to the Corp of Engineers and the Little Calumet River Basin Commission using concrete barriers and sand bagging.  Our hope is to gain final approval of utilizing this flood mitigation method opposed to using the bladder system. 


Contact Us

1005 Ridge Road
Munster, IN 46321
Get Directions

  • Phone: 219-836-6900
  • Staff Directory

Stay Connected: